short update cuz someone requested it :D

Well, ever since school started. It had been a rush for homework. Since, the 'holiday' week had ended. I was leftover with one homework.. And that took up most of my time.. till last wed.. and now I'm rushing for many homework again =.='' Let's look at my workload ok?

  1. PDW portfolio.. That is a one perspective drawing of a room.. Detailed and shadows are needed.... This is like 5% done... and it's due on monday... T^T
  2. Study for Jap. Since my written test is on next next week and next next next week is my speaking one. This is also due on monday, since my lesson is then AND I gotta ask my teacher about the sentence structures.. I'm still unclear on it.
  3. 3DD portfolio.. An object done in 3D in Photoshop. This is 99% done, I left with the finishing touches. Due on monday.. Dang, gotta print it out soon.
  4. 3DD assignment 1, makeover packaging. We gotta choose a product and improve the packaging. It gotta be different from the product chosen. Different in every way except for the logo. This is technically not started yet.. Since all I did was to vector the logo, get the layout of the new packaging and try it out. I'm left with practically everything.. Designing of the layout, a prototype of the actual size and comparisons of the new packaging to the old one. Due on upcoming wed.
  5. DAV final assignment. A group proj on a short film. I'm not too worried about this since it is a group proj. This is due in 3 weeks time. I believe this can be done.. though my time is taken up.. =.=
  6. PDW final assignment. This is a pair proj. An A1 picture of a city in perspective along with 3 figures... Not as easy as it sounds.. since it's a fricking city.. so more buildings... (faints) This is due in two weeks(?) and my partner is one that I didn't have a choice in... haiz.. At least, it isn't the worst case scenario...
  7. ANI portfolio.. basically, a written research.. I mean typed .___. this is also a pair one.. and i'm partner-less... again =.= sheesh.. due in three(?) weeks time, I think.
  8. 3DD final assignment aka assignment 2. This haven't been given but I have to start early.. since I seen the assignment brief and it isn't easy.. It's to draw and do out a clay model for a mascot in ICT.. And I currently have no ideas T^T The proj brief is the upcoming wed.. so I suppose I can hope that it is not this .____. We will be given two(?) weeks only, I think.

So basically, I'm screwed.. =.=

Tata...~